Home Remodel

August - December 2016
finished kitchen

Kitchen

The dining room, the hall, and the kitchen area before the remodel removed the walls separating them.

old dining roomold hall and stairsold kitchenold kitchen

Destruction of the walls was the first task, along with filling in the stairs and creating a storage area underneath.

wall destructionstairway fill-in

Because we removed a wall, the foundation had to be extended and strengthened.

foundationfoundation

The floors had to be prepared for the tile, then the cabinets installed.

floor preparationtiletile and cabinetscabinets installed

Now final painting was done, then the countertops were installed. The island is a spectactular piece of granite.

paintingcountertopcountertopcountertopbacksplash installedappliances reinstalledback door replaced

The backsplash was now installed, followed by reinstalling our main appliances.

Finally the back door was replaced.

The finished product of the kitchen renovation is seen in the picture at the top of this page (  ) and the dining room is below.

dining room

Family Room

The family room changes were less extensive, but we covered the beams, added much insulation, and a wet-bar and storage area for the pool.

family roomfamily roomfamily roomfamily roomfinished family roomfinished family room

Hall & Bathroom

We had to take out a sofit in the bathroom and remove bricks from the front entrance wall, but these were the simple alterations. Recessed lighting was installed throughout.

bathroombathroomfinished bathroomhallfinished hallfinished hall